
#853 • 3/2003PRINTED IN U.S .A .OPERATION & SERVICE MANUAL®COOK/HOLD/SERVE SYSTEMSW164 N9221 Water Street ●P.O. Box 450 ●Menomonee Falls, Wisconsi
#853 ROTISSERIE OPERATION AND CARE — PG. 7.PRODUCT PREPARATIONFor a more flavorful product, season the inside ofeach chicken prior to cooking. Opera
COOK TIMEEstimate 60 to 75 minutes of cooking time for 3to 3-1/2 pound (1,3 to 1,6 kg) birds and 50 to 60minutes cook time for 2-1/2 lb. (1,2 kg) bird
The cleanliness and appearance of this equipmentwill contribute considerably to operating efficiencyand savory, appetizing food. Good equipment thati
#853 ROTISSERIE OPERATION AND CARE — PG. 10.The rotisserie cannot be field converted from onetype of gas to another (natural gas to propane orvice v
#853 ROTISSERIE OPERATION AND CARE — PG. 11.DEFECT OBSERVEDELECTRICELECTRICALALSpits and lamps do not workInterior light off butspits workOne spit is
#853 ROTISSERIE OPERATION AND CARE — PG. 12.4"37"11.8"70.9"4"11.8"11.8"11.8"11.8"11.8"77.5"77.
#853 ROTISSERIE OPERATION AND CARE — PG. 13.ILLUSTRATION 1 - AR-6G Pedestal, sheet metal with baked enamel finish, has six swivel casters, three of
#853 ROTISSERIE OPERATION AND CARE — PG. 14.ILLUSTRATION 2 - CONTROL PANELPower SwitchReflectorCastingSpit MotorSwitchesIgniter SwitchGas Burner Cont
#853 ROTISSERIE OPERATION AND CARE — PG. 15.ILLUSTRATION 3SPARKGENERATORBURNERORIFICESMOTORDRIVEMOTORDRIVEMOTORDRIVETERMINALBLOCKLAMP ASSEMBLYSIDE PA
CORDINCLUDES PLUGUNIONGASSHUTOFFVALVEGASREGULATOR#853 ROTISSERIE OPERATION AND CARE — PG. 16.ILLUSTRATION 4TERMINALBLOCKCOOLING FANMOTORMOTOR DRIVEAN
®GAS ROTISSERIEModel: AR-6GInstallation, Operation & Maintenance ManualNote:Note:In some prominent location, instructions obtained from thelocal
#853 ROTISSERIE OPERATION AND CARE — PG. 17.
#853 ROTISSERIE OPERATION AND CARE — PG. 18.
TRANSPORTATION DAMAGE and CLAIMSAll Alto-Shaamequipment is sold F.O.B.shipping point, andwhen accepted by thecarrier, such shipmentsbecome the propert
NOTENOTELes instructions provenant du fournisseur local degas doivent être affichées de manière à indiquer lesprocedures à suivre au cas où l'uti
Upon receipt of the Alto-Shaamgas rotisserie, check the exteriorof the shipping crate for anyphysical damage that could resultin damage to the content
Installation of this rotisserie must include aprovision for an adequate flow of fresh air for gascombustion. This requirement must be observed bythe
The installation of this rotisserie must becompleted by a qualified installer familiar with thelocal codes and regulations governing the installationo
LEAK TESTINGIf a pressure leak test above 1/2 psi is to beconducted on the building supply gas piping, theshutoff gas valve and rotisserie inlet gas s
GAS FLAME PATTERNSWhen starting the rotisserie after initial installation, the gas lines must be free of air pockets. It maytake up to 30 minutes to
The MAIN POWER switch is located on the left sideof the control panel. When this switch is in the ONposition, the indicator lights located at the t
Commenti su questo manuale